Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Draft B Content:

...

Uploading Draft B Document

After the Pilot Lab receiving the measurement results for participants and once done he will prepare the Draft B and upload it in ILC Details Tab Click on “Upload Draft B” button as shown below

...

After Uploading the Draft A Document the ILC Status will change to “Waiting for Approval” as shown below

...

After TC Chair approving the Draft B Document The ILC Stage will change to “ Final Report “ and status will be “In Progress” as shown below

...