GCC Standardization Organization | e-Services Documentation

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Draft B Content:

In this Stage the Pilot Lab will Upload the Draft B Document.

Uploading Draft B Document

Click on “Upload Draft B” button as shown below

After Uploading the Draft A Document the ILC Status will change to “Waiting for Approval” as shown below

Now the TC Chair will Send the Draft A Document to Review/Voting and Approving the Document

After TC Chair approving the Draft B Document The ILC Stage will change to “ Final Report “ and status will be “In Progress” as shown below

  • No labels